Two SCE buildings on Option D each use 36,000 kWh in July. Building A peaks at 100 kW, and 70 kW from 4 to 9 p.m. Its demand charges come to $4,579.00.
Building B peaks at 180 kW, and 150 kW from 4 to 9 p.m. Its demand charges are $8,851.80. Same kWh, but $4,272.80 more, set by 15-minute peaks.
See the full example on our blog.
Short answer: A commercial demand charge is a monthly fee based on your building's highest 15-minute burst of power, measured in kilowatts (kW). On SCE's TOU-GS-2 Option D rate, it is $28.01 per kW for the month's top peak at any hour, plus $25.40 per kW for the top summer weekday peak from 4 to 9 p.m.
Who is this guide for?
This guide is for owners and managers of commercial buildings in Southern California Edison (SCE) territory. It uses SCE rates in effect on October 1, 2026. Every rate below cites the SCE tariff sheet it comes from.
What is the difference between kW and kWh on a business bill?
A kilowatt-hour (kWh) measures how much energy a building uses over time. A kilowatt (kW) measures how fast it uses energy at one moment. Think of kWh as miles driven and kW as top speed.
Here is a simple case. One 10 kW unit that runs for 10 hours uses 100 kWh. Ten 10 kW units that run together for 1 hour also use 100 kWh. Both use the same energy. But the second case draws 100 kW at once, so its demand is ten times higher.
How does SCE measure demand?
SCE's meter records the average power your building draws in each 15-minute block. SCE's TOU-GS-2 rules (Sheet 91755-E, effective Oct 1, 2026) say the maximum demand is the highest average kW in any 15-minute interval. Billing demand is that number, rounded to the nearest kW. The same sheet adds one exception: "Where the demand is intermittent or subject to violent fluctuations, a 5-minute interval may be used."
To turn a 15-minute reading into kW, multiply the kWh in that block by 4. For example, 35 kWh used in one 15-minute block equals 140 kW of demand (35 × 4 = 140). If that is the highest block of the month, 140 kW sets the facilities-related demand charge.

What is the difference between facilities-related and time-related demand charges?
SCE bills two kinds of demand charges on most mid-size and large business rates. They look at different hours.
- Facilities-related demand charge. This uses your single highest 15-minute peak in the whole billing period, at any hour or day (Sheet 91755-E).
- Time-related demand charge. This uses your highest 15-minute peak inside a set window. On SCE's Option D and Option E, that window is 4 p.m. to 9 p.m. on weekdays (Sheets 91745-E and 91750-E).
SCE's summer season runs from June 1 to October 1 (Sheet 91751-E). In summer, weekdays from 4 to 9 p.m. are "on-peak." In winter, there is no on-peak period, and 4 to 9 p.m. is "mid-peak" every day (Sheet 91750-E). The winter time-related demand charge applies to weekdays from 4 to 9 p.m.
| Demand charge | Which peak counts | CCA accounts |
|---|---|---|
| Facilities-related | Highest 15-minute peak at any hour of the billing period | Paid to SCE in full (delivery charge) |
| Time-related, summer | Highest 15-minute peak, weekdays 4–9 p.m., June 1 to Oct 1 | SCE delivery part only |
| Time-related, winter | Highest 15-minute peak, weekdays 4–9 p.m., Oct 1 to June 1 | SCE delivery part only |
For the full calendar of SCE time periods, see how SCE time-of-use periods and demand charges work.
What are SCE's demand charges as of October 1, 2026?
The table below lists SCE demand charges for service below 2 kV. All rates took effect October 1, 2026, under Advice Letter 5897-E, with some sheets reissued in supplement 5897-E-A on October 19, 2026. Bundled rates include SCE delivery and SCE power supply.
| SCE rate and option | Facilities-related ($/kW) | Summer peak, weekdays 4–9 p.m. ($/kW) | Winter, weekdays 4–9 p.m. ($/kW) | Tariff sheet |
|---|---|---|---|---|
| TOU-GS-1 Option E (default, up to 20 kW) | $0.00 | $0.00 | $0.00 | 91716-E |
| TOU-GS-1 Option D | $19.65 | $16.85 | $5.71 | 91717-E |
| TOU-GS-2 Option D (default, over 20 to under 200 kW) | $28.01 | $25.40 | $7.64 | 91745-E |
| TOU-GS-2 Option E | $14.27 | $2.89 | $1.02 | 91746-E |
| TOU-GS-3 Option D (default, 200 to 500 kW) | $31.85 | $29.90 | $9.85 | 91771-E |
| TOU-GS-3 Option E | $15.16 | $3.60 | $1.38 | 91772-E |
The TOU-GS-1 customer charge is $0.562 per day (Sheets 91716-E and 91717-E). The monthly customer charge is $232.74 on TOU-GS-2 (Sheets 91745-E and 91746-E) and $1,188.00 on TOU-GS-3 (Sheets 91771-E and 91772-E).
To see how these rates moved on October 1, read what SCE's October 2026 rate change means for businesses. To compare the two options side by side, read SCE Option D vs Option E.
Worked example: how can two buildings with the same kWh pay very different demand charges?
This example uses two made-up buildings on SCE TOU-GS-2 Option D, bundled, below 2 kV, in a July billing period. Rates come from Sheet 91745-E, effective Oct 1, 2026. Both buildings use 36,000 kWh in the month. Only their peaks differ.
- Building A runs steady. Its top peak at any hour is 100 kW. Its top weekday peak from 4 to 9 p.m. is 70 kW.
- Building B starts many machines at once. Its top peak at any hour is 180 kW. Its top weekday peak from 4 to 9 p.m. is 150 kW.
| Line (TOU-GS-2 Option D, July) | Building A | Building B |
|---|---|---|
| Facilities charge: peak × $28.01 | 100 × $28.01 = $2,801.00 | 180 × $28.01 = $5,041.80 |
| Summer peak charge: 4–9 p.m. peak × $25.40 | 70 × $25.40 = $1,778.00 | 150 × $25.40 = $3,810.00 |
| Total demand charges | $4,579.00 | $8,851.80 |
Building B pays $4,272.80 more in demand charges ($8,851.80 − $4,579.00) for the same 36,000 kWh. The gap comes only from how high each building peaked. This is an example, not a typical bill or a quote. It leaves out energy charges, taxes and other line items.

What happens if a building peaks before 4 p.m.?
A peak at 10 a.m. still sets the facilities-related charge for the month. The time-related charge looks only at the 4 to 9 p.m. weekday window. So a building that peaks in the morning pays the facilities charge on that morning peak and the time-related charge on a smaller evening peak.
What should you take away?
One 15-minute block can set a charge that lasts the whole month. On TOU-GS-2 Option D, each extra kW of peak adds $28.01, and each extra kW between 4 and 9 p.m. on a summer weekday adds another $25.40. That is why two buildings with the same energy use can get very different bills, as we explain in why a business electric bill is so high and why a business electric bill went up.
Whether your demand charges are set right depends on your rate, your option and your meter data. If you want a second look at how demand charges show up on your SCE bills, contact us below.
Figures checked against SCE's published tariff sheets on October 30, 2026.
Frequently asked questions
What is a demand charge on a business electric bill?
A demand charge is a monthly fee based on your building's highest 15-minute rate of power use, measured in kilowatts (kW). It is separate from the energy charge for total kilowatt-hours (kWh). On SCE TOU-GS-2 Option D, the facilities-related demand charge is $28.01 per kW (Sheet 91745-E, effective Oct 1, 2026).
Can one 15-minute peak set the demand charge for the whole month?
Yes. SCE bills demand on the highest 15-minute average kW in the billing period (TOU-GS-2 Sheet 91755-E). Lower use on the other days of the month does not lower that month's demand charge.
Does every SCE business rate have a demand charge?
No. TOU-GS-1 Option E, the default for accounts up to 20 kW, has no demand charge (Sheet 91716-E). TOU-GS-1 Option D and the TOU-GS-2 and TOU-GS-3 options shown here do have demand charges.
Do CCA customers pay SCE demand charges?
Yes. A community choice aggregator (CCA) replaces SCE's power supply, not SCE's delivery. On TOU-GS-2 Option D, a CCA customer still pays SCE's $28.01 per kW facilities charge and the $12.54 per kW delivery part of the summer peak charge (Sheet 91745-E).
Sources & tariff citations
- SCE Schedule TOU-GS-2, Cal. PUC Sheets 91745-E (Option D), 91746-E (Option E), 91750-E (time periods), 91751-E (seasons), 91755-E (demand rules), effective Oct 1, 2026. Open SCE Tariff Books, then General Service/Industrial Rates (accessed 2026-10-30)
- SCE Schedule TOU-GS-3, Cal. PUC Sheets 91771-E (Option D) and 91772-E (Option E), effective Oct 1, 2026. Open SCE Tariff Books, then General Service/Industrial Rates (accessed 2026-10-30)
- SCE Schedule TOU-GS-1, Cal. PUC Sheets 91713-E (options), 91716-E (Option E) and 91717-E (Option D), effective Oct 1, 2026. Open SCE Tariff Books, then General Service/Industrial Rates (accessed 2026-10-30)
- SCE Advice Letter 5897-E (submitted Sept 29, 2026) and supplement 5897-E-A (submitted Oct 19, 2026), effective Oct 1, 2026, under CPUC Decision 26-04-033 (accessed 2026-10-30)
- SCE tariff books: commercial rate schedules (accessed 2026-10-30)
Related guides
- What SCE's October 1, 2026 rate change means for businesses
SCE changed business rates on Oct 1, 2026. CPP is now optional, Option DD opens for qualifying energy storage, and demand, customer and energy charges shifted. - How SCE time-of-use periods and demand charges work for businesses
A plain guide to SCE's peak hours for business rates and how the two kinds of demand charges are billed, using rates in effect Oct 1, 2026. - Why is my business electric bill so high?
Business electric bills are high for reasons beyond how many kWh you use. Demand charges, rate class, peak hours and who supplies your power all matter. - Why did my business electric bill go up?
A business electric bill can rise after a rate change, the June 1 season switch, one demand spike or a longer billing cycle. Here is what those changes mean. - SCE Option D vs Option E: which business rate option fits your building?
SCE Option E or Option D? Compare both on TOU-GS-2 and TOU-GS-3 with rates effective Oct 1, 2026, plus a worked July example that shows the math.