Video transcript
SCE bills two separate demand charges, set by your single highest 15-minute power draw. Take a building on TOU-GS-2 Option D that peaks at 120 kW at 2 p.m. 120 kW × $28.01 = $3,361.20.
Its weekday 4-9 p.m. peak is 95 kW: 95 kW × $25.40 = $2,413.00. Total summer demand charges: $5,774.20.
On Southern California Edison (SCE) commercial rate schedules effective October 1, 2026, the highest-cost window is 4:00 p.m. to 9:00 p.m. every day. For medium and large business accounts (TOU-GS-2, TOU-GS-3 and TOU-8), SCE bills electricity in two ways at once: per-kilowatt-hour (kWh) energy charges that change by time of day, plus two separate per-kilowatt (kW) demand charges set by your single highest 15-minute power draw during the billing month (Advice Letters 5897-E and 5897-E-A, Sheets 91723-E, 91745-E and 91771-E).
SCE business time-of-use (TOU) hours effective October 1, 2026
Across SCE's standard commercial schedules (TOU-GS-1, TOU-GS-2, TOU-GS-3 and TOU-8), the year is divided into a four-month summer season and an eight-month winter season, and each day is divided into time windows around the 4:00 p.m. to 9:00 p.m. evening ramp:
- Summer season (June 1 to October 1):
- On-Peak: 4:00 p.m. to 9:00 p.m. on non-holiday weekdays.
- Mid-Peak: 4:00 p.m. to 9:00 p.m. on weekends and holidays.
- Off-Peak: 12:00 a.m. to 4:00 p.m. and 9:00 p.m. to 12:00 a.m., every day.
- Winter season (October 1 to June 1):
- Mid-Peak: 4:00 p.m. to 9:00 p.m. every day (weekdays, weekends and holidays).
- Super-Off-Peak: 8:00 a.m. to 4:00 p.m. every day, when daytime solar generation on the California grid is highest.
- Off-Peak: 9:00 p.m. to 8:00 a.m. every day.
The two kinds of demand charges on SCE business bills
While energy charges measure total volume in kilowatt-hours (kWh), demand charges measure your highest 15-minute average power draw in kilowatts (kW) during the billing cycle. On SCE's default medium and large business option — Option D — two separate demand charges stack on the same bill:
- Facilities-Related Demand Charge (all hours, year-round): Billed on the single highest 15-minute kW reading recorded at any hour of the month, day or night, weekday or weekend. On TOU-GS-2 Option D (secondary voltage, Sheet 91745-E), this charge is $28.01 per kW effective October 1, 2026 ($4.90 transmission + $23.11 distribution), and 100% of it is a utility delivery charge. On TOU-GS-3 Option D (secondary voltage, Sheet 91771-E), it is $31.85 per kW.
- Time-Related Demand Charge (4:00 p.m. to 9:00 p.m. on non-holiday weekdays): Billed on the highest 15-minute kW reading recorded specifically during the 4:00 p.m. to 9:00 p.m. weekday window. On TOU-GS-2 Option D, the summer on-peak rate (June through September) is $25.40 per kW ($12.54/kW delivery + $12.86/kW generation), and the winter mid-peak rate (October through May) is $7.64 per kW ($2.11/kW delivery + $5.53/kW generation). On TOU-GS-3 Option D, the summer on-peak rate is $29.90 per kW ($13.91/kW delivery + $15.99/kW generation), and the winter mid-peak rate is $9.85 per kW ($2.39/kW delivery + $7.46/kW generation).
| Schedule (Option D, secondary voltage) | Demand charge | Hours that count | Delivery | SCE generation | Bundled total |
|---|---|---|---|---|---|
| TOU-GS-2 (above 20 to under 200 kW) | Facilities-related | Every hour of the month | $28.01/kW | $0.00/kW | $28.01/kW |
| TOU-GS-2 | Summer on-peak | Weekdays 4 to 9 p.m., Jun to Oct | $12.54/kW | $12.86/kW | $25.40/kW |
| TOU-GS-2 | Winter mid-peak | Weekdays 4 to 9 p.m., Oct to Jun | $2.11/kW | $5.53/kW | $7.64/kW |
| TOU-GS-3 (200 to 500 kW) | Facilities-related | Every hour of the month | $31.85/kW | $0.00/kW | $31.85/kW |
| TOU-GS-3 | Summer on-peak | Weekdays 4 to 9 p.m., Jun to Oct | $13.91/kW | $15.99/kW | $29.90/kW |
| TOU-GS-3 | Winter mid-peak | Weekdays 4 to 9 p.m., Oct to Jun | $2.39/kW | $7.46/kW | $9.85/kW |
Worked example: how a 120 kW building is billed on TOU-GS-2 Option D
Consider a commercial building in SCE territory on Schedule TOU-GS-2 Option D (secondary voltage, bundled service) during a summer billing month. Suppose the building's highest 15-minute demand occurs at 2:00 p.m. at 120 kW, and its highest 15-minute demand between 4:00 p.m. and 9:00 p.m. on a weekday is 95 kW:
| Demand charge line item | Billing kW | Delivery rate ($/kW) | Generation rate ($/kW) | Bundled total ($/kW) | Monthly charge (bundled) | Monthly charge (CCA delivery only) |
|---|---|---|---|---|---|---|
| Facilities-related demand (any hour) | 120 kW | $28.01 | $0.00 | $28.01 | $3,361.20 | $3,361.20 |
| Summer on-peak demand (wkdy 4-9 p.m.) | 95 kW | $12.54 | $12.86 | $25.40 | $2,413.00 | $1,191.30 |
| Total monthly demand charges (summer month) | — | — | — | — | $5,774.20 | $4,552.50 |
In a winter billing month with the exact same 120 kW midday peak and 95 kW weekday evening peak, the facilities-related demand charge stays $3,361.20 (120 kW × $28.01/kW) and the winter mid-peak demand charge is $725.80 (95 kW × $7.64/kW), for a winter demand-charge total of $4,087.00 on bundled service (plus the $232.74 monthly customer charge and per-kWh energy charges).
Interactive estimator: test your building's peak kW
Use the estimator below to see how facilities-related and 4:00 p.m. to 9:00 p.m. weekday demand charges combine on SCE's October 1, 2026 TOU-GS-2 and TOU-GS-3 Option D schedules:
Estimate from published tariff rates: SCE Advice Letter 5897-E (Sheets 91745-E and 91771-E, effective October 1, 2026), secondary voltage. Excludes energy charges, customer charge, taxes and fees. Not a quote and not a savings estimate. Runs in your browser: nothing is sent or stored.
When Option E or Option DD (energy storage) costs less than Option D
Option D is the standard default on TOU-GS-2, TOU-GS-3 and TOU-8. Inside those schedules, new customers can choose Option E or Option DD (Option DD is for customers with qualifying energy storage, SCE Sheet 91743-E). Option R stays open only to accounts already on it (SCE Sheet 91742-E).
- Option E (energy-intensive / low load factor, no solar/storage required): Option E trades a much lower facilities demand charge for a much higher summer peak energy price. On TOU-GS-2 Option E (Sheet 91746-E, as revised by Advice Letter 5897-E-A), the facilities-related demand charge is $14.27/kW (versus $28.01/kW on Option D) and time-related demand charges are much smaller, while the bundled summer peak energy price is $0.75579/kWh ($0.42385 delivery + $0.33194 power supply, versus $0.19358/kWh on Option D). Buildings that set a brief kW spike but use relatively few kWh — and stay quiet from 4:00 to 9:00 p.m. — can pay less on Option E.
- Option R (closed to new customers; available only to accounts already on it, per SCE Sheet 91742-E): Shifts money out of time-related demand charges and into time-of-use energy (kWh) charges.
- Option DD (customers with qualifying energy storage, SCE Sheet 91743-E): Opened on October 1, 2026 under Advice Letter 5897-E (Sheets 91743-E, 91770-E and 91628-E), Option DD adds a daily peak demand charge and excludes demand set between 8:00 a.m. and 1:00 p.m. from the local distribution part of the facilities charge.
Frequently asked questions
Do weekends have an on-peak demand charge on SCE business rates?
No. The summer on-peak period and the time-related demand charges on Option D apply on weekdays only, excluding holidays (Sheets 91750-E and 91776-E). However, the facilities-related demand charge looks at every hour of the month, including weekends and holidays, so a weekend afternoon spike can still set your facilities demand for the month.
What is the difference between Option D and Option E on TOU-GS-2?
Option D is the default rate with full demand charges ($28.01/kW facilities and $25.40/kW summer on-peak) and lower energy prices ($0.19358/kWh bundled summer on-peak). Option E lowers the facilities demand charge to $14.27/kW and reduces time-related demand charges, in exchange for a much higher summer peak energy price ($0.75579/kWh bundled on TOU-GS-2 Option E in Advice Letter 5897-E-A).
Do CCA customers still pay SCE demand charges?
Yes. Community Choice Aggregator (CCA) customers pay 100% of SCE's delivery demand charges — $28.01/kW for facilities-related demand plus $12.54/kW in summer (or $2.11/kW in winter) for time-related delivery demand on TOU-GS-2 Option D. Only the generation portion of the time-related demand charge is replaced by your CCA's generation rates.
Does SCE have a 12-month demand ratchet on TOU-GS-2 or TOU-GS-3?
No. On TOU-GS-2 and TOU-GS-3, the facilities-related demand charge is billed on that month's highest 15-minute kW reading (Sheets 91750-E and 91776-E). A high peak in one month does not carry forward onto the next month's demand calculation, though exceeding 20 kW or 200 kW in three months of a rolling 12-month period can move the account into the next rate schedule.
Sources & tariff citations
Related guides
- What SCE's October 1, 2026 rate change means for businesses
SCE changed business rates on Oct 1, 2026. CPP is now optional, Option DD opens for qualifying energy storage, and demand, customer and energy charges shifted. - Why is my business electric bill so high?
Business electric bills are high for reasons beyond how many kWh you use. Demand charges, rate class, peak hours and who supplies your power all matter. - Why did my business electric bill go up?
A business electric bill can rise after a rate change, the June 1 season switch, one demand spike or a longer billing cycle. Here is what those changes mean. - What is a demand charge? SCE business demand charges explained
What is a demand charge? It is the part of a business bill set by your peak kW. See how SCE measures it, with a worked TOU-GS-2 example at Oct 1, 2026 rates. - SCE Option D vs Option E: which business rate option fits your building?
SCE Option E or Option D? Compare both on TOU-GS-2 and TOU-GS-3 with rates effective Oct 1, 2026, plus a worked July example that shows the math.